Renaissance Services Oman partners with SOURCE® to produce the world’s first renewable water, made from sunlight and air, to serve its workforce and guests
ashley
Mar 07, 2023
Press Releases
DAVID CRANE JOINS SOURCE GLOBAL’S BOARD OF DIRECTORS
jeanna
Jul 11, 2022
Press Releases
His Excellency Governor General David John Hurley surveys innovative new technology bringing drinking water security to at-risk NSW youth
jeanna
Dec 17, 2021
Press Releases
Innovative Technology set to Produce Drinking Water from the Sky for Farm Workers
jeanna
Dec 14, 2021
Press Releases
TWM Group brings premium drinking water made from sunlight and air to remote worksites
jeanna
Nov 30, 2021
Press Releases
Google X Study Supports SOURCE Global’s Approach
jeanna
Nov 03, 2021
Press Releases
World’s first renewable drinking water to be offered across Aruba
jeanna
Oct 19, 2021
Press Releases
SOURCE to offer bottled water in the Middle East
jeanna
Sep 28, 2021
Press Releases
SOURCE and Social Capital bring clean, safe water to Central Valley California
jeanna
Sep 09, 2021
Press Releases
SOURCE Global and Conservation International project named to Fast Company 2021 World Changing Ideas List
jeanna
Jun 02, 2021
Press Releases
Patagonia to offer drinking water sourced from the sky, made with just sunlight and air
jeanna
May 13, 2021
Press Releases
In a Time of Water Insecurity, Homeless Community Turns to Sustainable Technology
jeanna
Apr 07, 2021
Press Releases
SOURCE solves century-old water quality issue by tapping the sky
jeanna
Mar 31, 2021
Media Inquiries
Contact the SOURCE Public Relations team at
(480) 712-0995
Or simply complete this form:
Hydropanel Production Tool
Hydropanel water production tool
For an accurate per Hydropanel production value in your area, please enter your zip code below.
Zip Code Search
Hydropanel General Installation Requirements:
Sunny mounting location – The SOURCE Hydropanel works best in full sun. Unobstructed sunlight required at least 5 hours per day. Avoid placing under shading objects such as trees, buildings, etc.
4 x 6 foot (1.2 x 1.8 meters) mounting area per Hydropanel.
Minimum clearance of 1ft (30cm) in front of and behind the panels to allow access for service.
Minimum 3 inches (8 cm) between hydropanels from side to side within an array.
SOURCE Hydropanels must be installed at least 15 feet (5 meters) away from windows and should be positioned considering hydropanel sound with respect to living spaces.
SOURCE Hydropanels must be level from side-to-side with a maximum deviation of 20mm.
Hydropanel must be South Facing (180°) for locations in the Northern Hemisphere, or North facing (0°) for locations in the Southern Hemisphere.
The installation surface must be level. For example, a flat roof, or level ground.
Roof mounted hydropanels must be at least 3 feet (1 meter) away from the edge of any structure.
Adequate structural integrity of the roof is required. Do not install on a roof that is damaged or otherwise insufficient to hold the weight and wind loads of the hydropanel.
Consider whether there is space for a crane to set up and lift the hydropanels to their mounting location.
Ground locations should be firm, level, and evenly composed. The hydropanel can be placed on blocks, concrete, or mounted to lumber to provide a stable base to sit on.
Consider factors like soil composition, and how to manage erosion or plant growth over time.
Avoid installing the hydropanel where they may be wetted from irrigation sprinklers.
Ensure the hydropanel is raised above the specified flood plain.
Hydropanel should be anchored to the ground or sufficiently ballasted to prevent movement or damage from high winds.
Hydropanel General Installation Requirements:
Sunny mounting location – The SOURCE Hydropanel works best in full sun. Unobstructed sunlight required at least 5 hours per day. Avoid placing under shading objects such as trees, buildings, etc.
4 x 6 foot (1.2 x 1.8 meters) mounting area per Hydropanel.
Minimum clearance of 1ft (30cm) in front of and behind the panels to allow access for service.
Minimum 3 inches (8 cm) between hydropanels from side to side within an array.
SOURCE Hydropanels must be installed at least 15 feet (5 meters) away from windows and should be positioned considering hydropanel sound with respect to living spaces.
SOURCE Hydropanels must be level from side-to-side with a maximum deviation of 20mm.
Hydropanel must be South Facing (180°) for locations in the Northern Hemisphere, or North facing (0°) for locations in the Southern Hemisphere.
The installation surface must be level. For example, a flat roof, or level ground.
Roof Mount Requirements:
Roof mounted hydropanels must be at least 3 feet (1 meter) away from the edge of any structure.
Adequate structural integrity of the roof is required. Do not install on a roof that is damaged or otherwise insufficient to hold the weight and wind loads of the hydropanel.
Consider whether there is space for a crane to set up and lift the hydropanels to their mounting location.
Ground Mount Requirements:
Ground locations should be firm, level, and evenly composed. The hydropanel can be placed on blocks, concrete, or mounted to lumber to provide a stable base to sit on.
Consider factors like soil composition, and how to manage erosion or plant growth over time.
Avoid installing the hydropanel where they may be wetted from irrigation sprinklers.
Ensure the hydropanel is raised above the specified flood plain.
Hydropanel should be anchored to the ground or sufficiently ballasted to prevent movement or damage from high winds.