Source Logo
Press

Upgrade to Digital Water: Zero Mass Water Deploys New Sensor to Monitor and Optimize Your Drinking Water

Upgrade to Digital Water: Zero Mass Water Deploys New Sensor to Monitor and Optimize Your Drinking Water

How do we fully digitize and perfect the drinking water experience? Zero Mass Water’s new sensor lets you know the quality of your water with confidence. Today at CES 2019, Zero Mass Water announced a new addition to its SOURCE sensor suite, called SOURCE Informed (SI), that brings real-time water-quality knowledge and automated optimization features to its SOURCE Hydropanels.

Zero Mass Water announced a new addition to its SOURCE sensor suite, called SOURCE Informed (SI), that brings real-time water-quality knowledge and automated optimization features to its SOURCE Hydropanels.

Announced last year, Zero Mass Water’s solar-powered SOURCE Hydropanels create drinking water directly from air and sunlight – no electrical input, pipes, or public utility infrastructure required – with unprecedented efficiency and across a wide range of humidity levels. Today’s announcement extends Zero Mass Water’s world-class combination of technologies, advancing the availability of perfect water and enabling the ability to know your water is perfect in real-time

Tome el control de su fuente de agua

Hemos creado soluciones personalizadas para necesidades hídricas en más de 50 países. Resolvamos la suya.

Hydropanel Production Tool

Hydropanel water production tool

For an accurate per Hydropanel production value in your area, please enter your zip code below.

Zip Code Search

Hidden

Hydropanel General Installation Requirements:

  • Roof mounted hydropanels must be at least 3 feet (1 meter) away from the edge of any structure.
  •  
  • Adequate structural integrity of the roof is required. Do not install on a roof that is damaged or otherwise insufficient to hold the weight and wind loads of the hydropanel.
  •  
  • Consider whether there is space for a crane to set up and lift the hydropanels to their mounting location.
  • Ground locations should be firm, level, and evenly composed. The hydropanel can be placed on blocks, concrete, or mounted to lumber to provide a stable base to sit on.
  •  
  • Consider factors like soil composition, and how to manage erosion or plant growth over time.
  •  
  • Avoid installing the hydropanel where they may be wetted from irrigation sprinklers.
  •  
  • Ensure the hydropanel is raised above the specified flood plain.
  •  
  • Hydropanel should be anchored to the ground or sufficiently ballasted to prevent movement or damage from high winds.

Hydropanel General Installation Requirements:

  • Sunny mounting location – The SOURCE Hydropanel works best in full sun. Unobstructed sunlight required at least 5 hours per day. Avoid placing under shading objects such as trees, buildings, etc.
  • 4 x 6 foot (1.2 x 1.8 meters) mounting area per Hydropanel.
  • Minimum clearance of 1ft (30cm) in front of and behind the panels to allow access for service.
  • Minimum 3 inches (8 cm) between hydropanels from side to side within an array.
  • SOURCE Hydropanels must be installed at least 15 feet (5 meters) away from windows and should be positioned considering hydropanel sound with respect to living spaces.
  • SOURCE Hydropanels must be level from side-to-side with a maximum deviation of 20mm.
  • Hydropanel must be South Facing (180°) for locations in the Northern Hemisphere, or North facing (0°) for locations in the Southern Hemisphere.
  • The installation surface must be level. For example, a flat roof, or level ground.

Roof Mount Requirements:

  • Roof mounted hydropanels must be at least 3 feet (1 meter) away from the edge of any structure.
  • Adequate structural integrity of the roof is required. Do not install on a roof that is damaged or otherwise insufficient to hold the weight and wind loads of the hydropanel.
  • Consider whether there is space for a crane to set up and lift the hydropanels to their mounting location.

Ground Mount Requirements:

  • Ground locations should be firm, level, and evenly composed. The hydropanel can be placed on blocks, concrete, or mounted to lumber to provide a stable base to sit on.
  • Consider factors like soil composition, and how to manage erosion or plant growth over time.
  • Avoid installing the hydropanel where they may be wetted from irrigation sprinklers.
  • Ensure the hydropanel is raised above the specified flood plain.
  • Hydropanel should be anchored to the ground or sufficiently ballasted to prevent movement or damage from high winds.

Hydropanel Calculator

The amount of water you consume will determine how many panels you’ll need and the size of tanks we recommend. Use our calculator below for our panel and tank recommendation.

Each panel produces on average 180 bottles per month (16.9 oz bottles). For a more accurate estimation based on your location use this tool.

Hidden
Hidden
Hidden
Hidden