Source Logo
Press

Lupe Fiasco On New World Water, And Changing The World With His Bars Before Leaving Rap Behind – Vibe Media

Lupe Fiasco On New World Water, And Changing The World With His Bars Before Leaving Rap Behind – Vibe Media

“People focus on Flint, but Flint is part of a small piece of a wider problem. There are cities all across this country that potentially can have the same issues, and are suffering from the same issues. These antiquated water systems and lead in the pipes and the privatization of the water supply.”

“‘You never have to worry about where your water is coming from because it is coming from you.’ It’s a creation just as futuristic and socially-minded as Lupe’s bars, and he’s actually helped install the panels himself in Jordan and the Philippines.”

“His investment in Zero Mass Water has him just as excited as other rappers would be about a platinum plaque. ‘It doesn’t matter if I sell a million records. I’m cool selling five records,’ Lupe insists. ‘But I’m going to sell five records to the five most powerful people in the world, and then we are gonna go out and partner, and change things.’”

Copyright to: Vibe Media

Take control of your water source

We’ve built custom solutions for water needs in more than 50 countries. Let’s solve yours.

Hydropanel Production Tool

Hydropanel water production tool

For an accurate per Hydropanel production value in your area, please enter your zip code below.

Zip Code Search

Hidden

Hydropanel General Installation Requirements:

  • Roof mounted hydropanels must be at least 3 feet (1 meter) away from the edge of any structure.
  •  
  • Adequate structural integrity of the roof is required. Do not install on a roof that is damaged or otherwise insufficient to hold the weight and wind loads of the hydropanel.
  •  
  • Consider whether there is space for a crane to set up and lift the hydropanels to their mounting location.
  • Ground locations should be firm, level, and evenly composed. The hydropanel can be placed on blocks, concrete, or mounted to lumber to provide a stable base to sit on.
  •  
  • Consider factors like soil composition, and how to manage erosion or plant growth over time.
  •  
  • Avoid installing the hydropanel where they may be wetted from irrigation sprinklers.
  •  
  • Ensure the hydropanel is raised above the specified flood plain.
  •  
  • Hydropanel should be anchored to the ground or sufficiently ballasted to prevent movement or damage from high winds.

Hydropanel General Installation Requirements:

  • Sunny mounting location – The SOURCE Hydropanel works best in full sun. Unobstructed sunlight required at least 5 hours per day. Avoid placing under shading objects such as trees, buildings, etc.
  • 4 x 6 foot (1.2 x 1.8 meters) mounting area per Hydropanel.
  • Minimum clearance of 1ft (30cm) in front of and behind the panels to allow access for service.
  • Minimum 3 inches (8 cm) between hydropanels from side to side within an array.
  • SOURCE Hydropanels must be installed at least 15 feet (5 meters) away from windows and should be positioned considering hydropanel sound with respect to living spaces.
  • SOURCE Hydropanels must be level from side-to-side with a maximum deviation of 20mm.
  • Hydropanel must be South Facing (180°) for locations in the Northern Hemisphere, or North facing (0°) for locations in the Southern Hemisphere.
  • The installation surface must be level. For example, a flat roof, or level ground.

Roof Mount Requirements:

  • Roof mounted hydropanels must be at least 3 feet (1 meter) away from the edge of any structure.
  • Adequate structural integrity of the roof is required. Do not install on a roof that is damaged or otherwise insufficient to hold the weight and wind loads of the hydropanel.
  • Consider whether there is space for a crane to set up and lift the hydropanels to their mounting location.

Ground Mount Requirements:

  • Ground locations should be firm, level, and evenly composed. The hydropanel can be placed on blocks, concrete, or mounted to lumber to provide a stable base to sit on.
  • Consider factors like soil composition, and how to manage erosion or plant growth over time.
  • Avoid installing the hydropanel where they may be wetted from irrigation sprinklers.
  • Ensure the hydropanel is raised above the specified flood plain.
  • Hydropanel should be anchored to the ground or sufficiently ballasted to prevent movement or damage from high winds.

Hydropanel Calculator

The amount of water you consume will determine how many panels you’ll need and the size of tanks we recommend. Use our calculator below for our panel and tank recommendation.

Each panel produces on average 180 bottles per month (16.9 oz bottles). For a more accurate estimation based on your location use this tool.

Hidden
Hidden
Hidden
Hidden